EXECUTION SCOPE

Key Engineering & Site Deliverables

  • Solar ACDB, LT Synchronization & Evacuation Panels with Anti-Islanding & Surge Protection
  • UV-Stabilized DC String Cabling, Armoured AC Evacuation Cabling & Roof-to-PCC Tray Routing
  • Dedicated Solar DC Earthing, AC Equipment Earthing & Roof Lightning Arresters (IS 3043)
  • DG-PV Synchronization Controller Wiring & Reverse Power Relay Integration for Industrial Sites
  • Bi-Directional Net Meter & Solar Generation Meter CT/PT Installation & MSEDCL Testing
  • Solar CEIG Drawing Submission, Form A Certification & Statutory Charging Permission
CODES & COMPLIANCE

Governing IS / IEC & Statutory Standards

Standard / CodeApplication Scope
CEA Technical StandardsConnectivity of Distributed Generation Resources (Grid-Tie Safety)
IS 3043 & IS/IEC 62305Dedicated Solar DC/AC Earthing & Roof Lightning Protection
IS 7098 / EN 50618Solar DC & Armoured AC Power Cabling Specifications
MERC Net Metering RegsMaharashtra Rooftop Solar Net/Gross Metering Compliance
Looking for turnkey Solar PV array EPC? Partner with our sister division ROOFITPV · Solar EPC ↗. Need a PVsyst Solar DPR first? Visit WATTPVFY ↗.
Related Representative Frameworks

Illustrative Execution Scopes for This Division

ILLUSTRATIVE SCOPE · AE-09

Solar AC/DC Evacuation & Bi-Directional Metering BoS

Inspect AE-09 →
ILLUSTRATIVE SCOPE · AE-07

MSEDCL HT Load Sanction & CEIG Charging Approval

Inspect AE-07 →
ILLUSTRATIVE SCOPE · AE-05

Chemical & Copper Plate Earthing Grid (IS 3043)

Inspect AE-05 →
⚡ Site Survey 💬 WhatsApp Call / Quote →
WhatsApp