INTEGRATED ENERGY ECOSYSTEM:

Licensed Electrical Execution Services (E1–E6)

Turnkey HT/LT electrical contracting, custom LT switchboards, distribution transformers, IS 3043 earthing, MSEDCL/CEIG statutory liaison, preventive AMC, and solar electrical BoS.

E1 · TURNKEY INFRASTRUCTURE

HT/LT Electrical Infrastructure

Complete industrial & commercial power distribution: armoured XLPE cabling, cable trays, busducts, rising mains, and internal electrification.

View Detailed E1 Scope →
E2 · SWITCHBOARDS

LT Panels (PCC / MCC / APFC)

Fabrication, supply, erection, and commissioning of PCC, MCC, AMF, SDB, and detuned APFC capacitor panels conforming to IS 8623 / IEC 61439.

View Detailed E2 Scope →
E3 · SUBSTATION & SAFETY

Transformers, Earthing & LPS

100–2500 kVA transformer installation, oil filtration/BDV testing, IS 3043 chemical & copper plate earthing, and IS/IEC 62305 lightning protection.

View Detailed E3 Scope →
E4 · REGULATORY LIAISON

MSEDCL & CEIG Statutory Liaison

New HT/LT load sanctions, contract demand enhancements, CEI drawing submissions, Form A test dossiers, and charging permissions in Maharashtra.

View Detailed E4 Scope →
E5 · LIFECYCLE UPTIME

Preventive Maintenance & AMC

Structured electrical AMCs, shutdown maintenance, IR thermography, ACB/VCB servicing, earth resistance audits, and safety compliance support.

View Detailed E5 Scope →
E6 · RENEWABLE GRID-TIE

Solar Electrical BoS & Evacuation

AC/DC balance-of-system execution, Solar ACDB/LT evacuation panels, DG-PV sync wiring, bi-directional metering, and Solar CEIG approvals.

View Detailed E6 Scope →
Engagement Models

Flexible Contracting Structures

Choose the commercial and execution model aligned with your internal procurement and engineering team.

Engagement Model Primary Scope Included Best Suited For Key Cost / Scope Drivers
Turnkey Electrical EPC Material supply (ISI/branded) + licensed installation + testing + statutory handover New MIDC factories, commercial buildings, substation upgrades kVA capacity, cable run lengths, copper vs. aluminium busbar, switchgear make
Labour + Licensed Supervision Skilled electricians, CEI supervisor oversight, tools, testing & Form A certification Clients supplying free-issue cables, panels, and transformers Man-days, shift/height working conditions, shutdown window constraints
Annual Maintenance Contract (AMC) Scheduled monthly/quarterly inspections, annual shutdown, thermography & reports Operational factories, IT parks, hospitals, warehouses Asset count (transformers, breakers, panels), response SLA, consumables
Statutory Liaison Package SLD preparation, MSEDCL portal filing, CEIG drawing & inspection coordination Load enhancement, new HT/LT connections, solar charging approvals Voltage level (LT/11kV/22kV/33kV), statutory fees (at actuals), site readiness
Solar BoS Execution AC/DC cabling, ACDB, earthing/LPS, DG-PV sync & bi-directional meter installation Solar EPCs (incl. ROOFITPV) and C&I solar asset owners Plant kWp/MWp, evacuation voltage, roof-to-PCC distance, CEIG applicability
Commercial & Technical Disclaimer: All electrical contracting proposals are issued strictly after physical site survey or verified BOQ/SLD evaluation. Statutory government/utility fees (MSEDCL demand notes, CEIG GRAS challans) are payable directly by the client at actuals.
⚡ Site Survey 💬 WhatsApp Call / Quote →
WhatsApp