INTEGRATED ENERGY ECOSYSTEM:

Engineering & Site-Readiness Onboarding Hub

Click any of the 8 interactive checklists below to mark ready inputs, unlock your reference code, transfer inputs directly into our enquiry desk, or export a crisp A4 PDF.

AE-LIAISON

New Electrical Connection / Load Enhancement Checklist

MSEDCL HT/LT application documents, load schedule, and meter room readiness.

AE-LIAISON

CEIG Inspection & Charging Permission Document List

Complete Maharashtra Chief Electrical Inspector dossier & Form A test checklist.

AE-PANELS

LT Panel (PCC / MCC / APFC) Specification Intake Sheet

Busbar rating, fault level, IP class, feeder schedule & detuned reactor inputs.

AE-TRANSFORMER

Transformer Installation & Testing Site Readiness Checklist

RCC plinth, oil soak pit, neutral/body earthing, HT protection & BDV tests.

AE-EARTHING

IS 3043 Earthing & Lightning Protection Audit Checklist

Soil resistivity, electrode count, test links, IS/IEC 62305 LPS & SPD verification.

AE-AMC

Industrial Electrical AMC & Preventive Maintenance Scope

Asset register, thermography, oil BDV, breaker servicing & shutdown SLA inputs.

AE-TURNKEY

Tender / BOQ Submission Input Checklist

BOQ, SLD, Approved Make List, contract structure & pre-bid site visit details.

AE-SOLARBOS

Solar Electrical BoS & Grid-Tie Readiness Checklist

ACDB/evacuation, DG-PV sync, solar earthing, net metering & CEIG readiness.

⚡ Site Survey 💬 WhatsApp Call / Quote →
WhatsApp