ILLUSTRATIVE EXECUTION SCOPE · REPRESENTATIVE PROJECT FRAMEWORK · AE-09
Solar AC/DC Evacuation & Bi-Directional Metering BoS
Representative framework for executing grid-compliant electrical Balance-of-System (BoS) for a C&I rooftop solar plant, including ACDB, evacuation cabling, DG-PV sync, dedicated earthing, and CEIG approval.
Framework Disclosure:
AE-09 is published as an Illustrative Execution Scope / Representative Project Framework detailing AAROHAN ELECTRICALS' standardized execution sequence, applicable IS/IEC standards, and handover deliverables.
Division E6 · Solar Electrical BoS
Technical Framework Parameters
| Plant Scope | 100 kWp – 1 MWp Rooftop / Shed Solar BoS |
| Evacuation | 415V LT PCC Tie-In / HT Step-Up Bay |
| Protection | Anti-Islanding, Type 1+2 SPDs, Reverse Power Relay |
| Statutory | MSEDCL Net Metering & Solar CEIG Charging |
EXECUTION & TESTING DELIVERABLES
Standardized Site Execution Sequence
- Supply & installation of IP65 Solar ACDB / LT Evacuation Panel with MCCB & surge arresters
- UV-protected DC/AC cable routing on covered GI trays with fire-seal penetrations
- Dedicated Solar DC Earthing, AC Equipment Earthing & Roof Lightning Protection (IS 3043)
- DG-PV synchronization controller wiring to prevent reverse current into diesel generators
- Bi-directional & solar generation meter testing, Form A & Solar CEIG charging permission