DG Synchronization & AMF Panel Integration
Representative framework for integrating Auto Mains Failure (AMF) changeover and multi-DG synchronization switchboards with mechanical/electrical interlocks and compliant generator neutral earthing.
Framework Disclosure:
AE-12 is published as an Illustrative Execution Scope / Representative Project Framework detailing AAROHAN ELECTRICALS' standardized execution sequence, applicable IS/IEC standards, and handover deliverables.
Division E2 · Backup Power
Technical Framework Parameters
| Backup Architecture | 125 kVA – 1000 kVA Single / Multi-DG Sets |
| Control Logic | Microprocessor AMF / Sync Controller (DeepSea / ComAp) |
| Interlocking | Electrical + Mechanical Mains-vs-DG Interlock |
| Earthing | 2 Dedicated DG Neutral Pits + 2 Body Pits |
EXECUTION & TESTING DELIVERABLES
Standardized Site Execution Sequence
- Supply & installation of AMF / DG Sync switchboard with motorized ACB / MCCB breakers
- Armoured power & multi-core control cabling between DG alternator, canopy & AMF panel
- Dedicated DG neutral & body earthing per IS 3043 with copper/GI flat strips
- Simulated mains-failure testing: auto-start timing, load transfer, cool-down & auto-stop
- Operator training on manual override, LOTO isolation & statutory CEIG DG documentation