DG Synchronization & AMF Panel Integration

Representative framework for integrating Auto Mains Failure (AMF) changeover and multi-DG synchronization switchboards with mechanical/electrical interlocks and compliant generator neutral earthing.

Framework Disclosure: AE-12 is published as an Illustrative Execution Scope / Representative Project Framework detailing AAROHAN ELECTRICALS' standardized execution sequence, applicable IS/IEC standards, and handover deliverables.
Division E2 · Backup Power

Technical Framework Parameters

Backup Architecture125 kVA – 1000 kVA Single / Multi-DG Sets
Control LogicMicroprocessor AMF / Sync Controller (DeepSea / ComAp)
InterlockingElectrical + Mechanical Mains-vs-DG Interlock
Earthing2 Dedicated DG Neutral Pits + 2 Body Pits
EXECUTION & TESTING DELIVERABLES

Standardized Site Execution Sequence

  • Supply & installation of AMF / DG Sync switchboard with motorized ACB / MCCB breakers
  • Armoured power & multi-core control cabling between DG alternator, canopy & AMF panel
  • Dedicated DG neutral & body earthing per IS 3043 with copper/GI flat strips
  • Simulated mains-failure testing: auto-start timing, load transfer, cool-down & auto-stop
  • Operator training on manual override, LOTO isolation & statutory CEIG DG documentation