INTEGRATED ENERGY ECOSYSTEM:
ILLUSTRATIVE EXECUTION SCOPE · REPRESENTATIVE PROJECT FRAMEWORK · AE-06

Commercial Building Internal & Rising Main Electrification

Representative framework for multi-storey commercial building electrification covering meter room busbars, vertical rising mains, floor tap-off distribution, and fire-rated emergency circuits.

Framework Disclosure: AE-06 is published as an Illustrative Execution Scope / Representative Project Framework detailing AAROHAN ELECTRICALS' standardized execution sequence, applicable IS/IEC standards, and handover deliverables.
Division E1 · Commercial EPC

Technical Framework Parameters

Distribution Architecture400A–800A Rising Main Busbar Trunking
Wiring StandardIS 732, FRLS / ZHFR Copper Conductors
Safety Protection30mA/100mA RCCB / RCBO per Floor DB
Fire SafetyFire-Barrier Shaft Sealing & Dedicated Fire Pump Feeder
EXECUTION & TESTING DELIVERABLES

Standardized Site Execution Sequence

  • Meter cabin layout compliant with MSEDCL clearances & ventilation norms
  • Vertical rising main installation with thrust bearings, fire barriers & floor tap-off boxes
  • Floor Sub-Distribution Boards (SDBs) with phase balancing & residual current protection
  • Dedicated armoured feeders for lifts, fire-fighting pumps, HVAC chillers & basement lighting
  • Complete circuit scheduling, insulation testing & Form A statutory certification